Attenuation & Water Management Solutions

JFC’s Attenuation Water Management solutions help control the rate at which water enters the watercourse or storm drain. Our industry leading products can be deployed in Infiltration / Soak-away,  Permeable and Impermeable Attenuation systems, which makes their range of applications incredibly broad.

HYDROCHAMBER

The JFC HydroChamber is an arched chamber attenuation system designed specifically for building underground storage tanks for stormwater runoff in attenuation and soak away applications.

Its superior design makes it suitable for building storage tanks under HGV trafficked and car park areas as well as non-trafficked areas (e.g. green amenity areas). JFC HydroChambers have many advantages over other similar products including BBA certification for HGV loading, superior structural strength, silt management, maintenance and inspection capabilities and cost effectiveness.

The HydroChambers are manufactured from high density polyethylene plastic and are backfilled with 35/50mm clean washed crushed stone. The corrugated arch shape of the HydroChamber provides excellent structural strength as shown in independently witnessed field tests where the chambers were exposed to loads 3.5 times greater than that expected in service.

HydroChambers can be used in three different types of Stormwater management systems:
  • Infiltration / Soak-away System
  • Permeable Attenuation System
  • Impermeable Attenuation System

A site audit will determine the most suitable system.

Features & Benefits:

  • BBA Certification
  • Superior Structural Integrity
  • Visual and Camera Inspection
  • Silt/Grit Management System
  • Stackable for storage on site
  • Design and Installation Manuals provided
  • Sizing Calculator
  • AutoCAD Drawings
  • Full Technical Assistance
  • Installation Service
HydroChamber 800 Specification
  • Overall Dimensions (mm): 2325 x 1265 x 800
  • Installed Dimensions (mm): 2175 x 1265 x 800
  • Nominal Storage* (m³): 2.1 – 2.8 / Chamber
  • Lateral Flow: 114 Holes x Ø20mm
HydroChamber 800 Specification
BBA logo
WRc Approved
JFC Hydrochamber
JFC HydroChamber Site Image

*System storage is dependent on foundation depth, distribution pipe diameter and the overall system size.

See HydroChamber calculator for more details.

Inspection & Maintenance:

The HydroChamber is a unique attenuation system that minimizes the entrance of grit / silt due to the two upstream catch-pit manholes.  Standard drain cleaning and inspection equipment allows maintenance and inspection to be conducted on the main distribution pipe.  Chamber rows can be camera inspected as required.

Make JFC your Stormwater Management Consultant and Provider

Inspection & Maintenance
  • Customised Stormwater management solutions in accordance with local authority legislation
  • Tank Sizing and calculations
  • Detailed report (for planning permission)
  • On site consultation

 

Supply and Installation Services

JFC offer a number of options when supplying and installing a Stormwater management system

  • Supply and install
  • Supply and supervise
  • Supply only

All JFC Stormwater management solutions include full excavation drawings

JFC also offer a number of services to enhance the supply and installation of the Stormwater management system.

These include:

  • Full Design Service
  • Stormwater Management Reports
  • Excavation Drawings
  • AutoCAD Drawings
  • Excel Calculators
  • Design Manuals
  • Installation Manuals
  • BBA Certification
  • Technical Presentations
  • Local Authority Support

*System storage is dependent on foundation depth, distribution pipe diameter and the overall system size.  See HydroChamber calculator for more details.

HYDROSEAL

The HydroSeal is a rotationally moulded flanged coupler designed to create a watertight seal when JFC CorriPipe™ passes through an impermeable liner (or GCL layer) commonly found in Stormwater Attenuation Systems.  The unit comprises two identical flanged couplers one of which has a pre-fabricated internal neoprene layer.

It is very easy to install.   One half is placed either side of where the pipe is to pass through the impermeable membrane or GCL layer.  When bolted back to back the impermeable layer becomes sandwiched between the units offering a tight seal.  The impermeable layer is then trimmed away from the inside of the joint and a standard twinwall CorriPipe™ can be attached

Features & Benefits:

  • Quick and easy to install
  • Tight Seal
  • No on-site welding required
  • Available in several sizes
  • Can be installed in wet weather

Product Gallery

JFC HydroSeal HS300
JFC HydroSeal
JFC HydroSeal HS600
INTERCEPTORS

Surface water drains normally discharge to a watercourse or indirectly into underground waters via a soak away.   Contamination of surface water by oil, chemicals or suspended solids can cause these discharges to have a serious impact on the receiving water.  Interceptors protect receiving waters from such pollutants.

Operation:

Interceptors remove pollutants from effluent and allow cleaner water to pass into a surface water drainage system.  Pollutants are retained for removal and disposal.  Interceptors work by allowing the pollutants and water to naturally separate.  Pollutants float to the surface of the water for easy removal.  Silt settles within the unit and can be easily removed.  All JFC Inceptors are manufactured to IS EN ISO; 9001:2000 and conform to European Standard PR EN 858 – 1 & 2.

ByPass Interceptor
  • Used on low risk sites (Car Parks)
  • Sized in litres per second flow
  • Available in Class 1 format
JFC BPDA Interceptor

Sizes:

Product Code Drainage Area m² Peak Flow (L/s) Nominal Flow (L/s) Oil Storage (L) NSB Ref
BPDA1950 1,950 3.5 35 l 52.5 3.5
BPDA2500 2,500 4.5 45 67.5 4.5
BPDA3300 3,300 6.0 60 90 6
BPDA4400 4,400 8.0 80 120 8
BPDA5555 5,555 10.0 100 150 10
BPDA6900 6,900 12.5 125 187.5 12.5
BPDA8300 8,300 15 150 225 15
BPDA10000 10,000 18 180 270 18
BPDA13333 13,333 24 240 360 24

Best Management Practice:

Best management practices should be maintained to ensure a clean network at all times. Sinkable solids and floatable contaminants should be prevented where possible from entering the unit by means of a dedicated silt traps and/or sumped catchpit manhole (s) upstream thus preventing potential problems.

It is important to note that a large amount of the settable solids are present in the network during construction and this is mainly due to the silt/grit present in construction runoff. To account for this, the following inspection and maintenance guidelines are recommended as best management practice:

  • Initially inspect the catchpit manholes on a monthly basis (periodically thereafter)
  • If cathchpit is 30% full, de-sludge the catchpit (s) with a standard vacuum tanker
  • If large amounts of silt present, additional catchpit manholes with 90 degree bends may be required
  • When construction is finished a full camera inspection is recommended on the network
  • Any contaminants found in the line should be flushed/jetted and the catchpits de-sludged